<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>FRCV | IMR</title>
	<atom:link href="https://imrmedia.in/tag/frcv/feed/" rel="self" type="application/rss+xml" />
	<link>https://imrmedia.in/tag/frcv/</link>
	<description>Indian Military Review, Defense News, Indian Defence Review</description>
	<lastBuildDate>Sat, 29 Mar 2025 06:13:35 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://imrmedia.in/wp-content/uploads/2020/04/cropped-IMR-Logo-512x512-px-32x32.jpg</url>
	<title>FRCV | IMR</title>
	<link>https://imrmedia.in/tag/frcv/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>BEML Ltd Seeks Global Partners for Next- Gen Combat Vehicle Development </title>
		<link>https://imrmedia.in/beml-ltd-seeks-global-partners-for-next-gen-combat-vehicle-development/</link>
					<comments>https://imrmedia.in/beml-ltd-seeks-global-partners-for-next-gen-combat-vehicle-development/#respond</comments>
		
		<dc:creator><![CDATA[IMR Reporter]]></dc:creator>
		<pubDate>Fri, 28 Mar 2025 06:09:13 +0000</pubDate>
				<category><![CDATA[Daily Defence News]]></category>
		<category><![CDATA[Defence Industry]]></category>
		<category><![CDATA[BEML]]></category>
		<category><![CDATA[FRCV]]></category>
		<category><![CDATA[Future Ready Combat Vehicle]]></category>
		<category><![CDATA[Next-Gen Combat Vehicle]]></category>
		<category><![CDATA[T-72]]></category>
		<guid isPermaLink="false">https://imrmedia.in/?p=18033</guid>

					<description><![CDATA[<p>BEML Ltd, a prominent Indian public sector undertaking under the Ministry of Defence, has announced its intention to develop a Future Ready Combat Vehicle (AFV-FRCV) for the Indian Army, seeking global partners for a License and Technology Collaboration Agreement. This initiative aligns with India&#8217;s Make in India initiative and aims to replace the aging T-72 [&#8230;]</p>
<p>The post <a href="https://imrmedia.in/beml-ltd-seeks-global-partners-for-next-gen-combat-vehicle-development/">BEML Ltd Seeks Global Partners for Next- Gen Combat Vehicle Development </a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">BEML Ltd, a prominent Indian public sector undertaking under the Ministry of Defence, has announced its intention to develop a Future Ready Combat Vehicle (AFV-FRCV) for the Indian Army, seeking global partners for a License and Technology Collaboration Agreement. This initiative aligns with India&#8217;s Make in India initiative and aims to replace the aging T-72 fleet with a versatile, modular combat vehicle featuring modern armor, enhanced mobility, and advanced technologies. The project not only enhances India&#8217;s indigenous defense capabilities but also positions BEML as a significant player in the global defense market, with potential for future exports, thereby reducing dependence on foreign military imports amid regional tensions.</p>



<p class="wp-block-paragraph"></p>
<p>The post <a href="https://imrmedia.in/beml-ltd-seeks-global-partners-for-next-gen-combat-vehicle-development/">BEML Ltd Seeks Global Partners for Next- Gen Combat Vehicle Development </a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://imrmedia.in/beml-ltd-seeks-global-partners-for-next-gen-combat-vehicle-development/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>ARMY MODERNISATION-FRCV and Light Tanks to Meet Future War Requirements</title>
		<link>https://imrmedia.in/army-modernisation-frcv-and-light-tanks-to-meet-future-war-requirements/</link>
					<comments>https://imrmedia.in/army-modernisation-frcv-and-light-tanks-to-meet-future-war-requirements/#respond</comments>
		
		<dc:creator><![CDATA[Lt Gen AB Shivane PVSM, AVSM]]></dc:creator>
		<pubDate>Sat, 20 Apr 2024 06:44:18 +0000</pubDate>
				<category><![CDATA[Air Force]]></category>
		<category><![CDATA[Modernisation]]></category>
		<category><![CDATA[AFV]]></category>
		<category><![CDATA[army modernisation]]></category>
		<category><![CDATA[FRCV]]></category>
		<category><![CDATA[Future Ready Combat Vehicle]]></category>
		<category><![CDATA[light tank]]></category>
		<category><![CDATA[T-72 tank]]></category>
		<guid isPermaLink="false">https://imrmedia.in/?p=17409</guid>

					<description><![CDATA[<p>Introduction The ongoing trials of the light tank, system upgrade cum overhaul of T72 and the recent RFP to produce Future Ready Combat Vehicle (FRCV) have raised many eyebrows. Those professing the obituary of tanks and the exaggerated discourse on its suspect role in future battlespace lie disappointed and professionally misplaced. The utility of a [&#8230;]</p>
<p>The post <a href="https://imrmedia.in/army-modernisation-frcv-and-light-tanks-to-meet-future-war-requirements/">ARMY MODERNISATION-FRCV and Light Tanks to Meet Future War Requirements</a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"><strong>Introduction</strong></p>



<p class="wp-block-paragraph">The ongoing trials of the light tank, system upgrade cum overhaul of T72 and the recent RFP to produce Future Ready Combat Vehicle (FRCV) have raised many eyebrows. Those professing the obituary of tanks and the exaggerated discourse on its suspect role in future battlespace lie disappointed and professionally misplaced.</p>



<p class="wp-block-paragraph">The utility of a tank lies in its deployability, employability and capability to be the decisive force. Its optimisation lies in its inclusive role as an agile, lethal, and survivable platform to lead the combined arms team and attain combat overmatch across all spectrums of conflict. Thus, the need to understand the role, desired capabilities, and fleet management perspective.</p>



<p class="wp-block-paragraph">The operational requirement is essentially based on medium-category tanks with light tanks supplementing its capabilities for marginal terrain like Northern borders. This remains the foundation of future operational and equipment construct.</p>



<p class="wp-block-paragraph"><strong>Modernisation Fundamentals and Upgradation Construct</strong></p>


<div class="wp-block-image">
<figure class="aligncenter size-full"><img fetchpriority="high" decoding="async" width="600" height="400" src="https://imrmedia.in/wp-content/uploads/2024/05/09D-A-artillery-barrage-demonstration-during-the-Bharat-Shakti-exercise-at-Pokhran-Rajasthan.jpg" alt="A-artillery-barrage-demonstration-during-the-Bharat-Shakti-exercise-at-Pokhran-Rajasthan" class="wp-image-17412" srcset="https://imrmedia.in/wp-content/uploads/2024/05/09D-A-artillery-barrage-demonstration-during-the-Bharat-Shakti-exercise-at-Pokhran-Rajasthan.jpg 600w, https://imrmedia.in/wp-content/uploads/2024/05/09D-A-artillery-barrage-demonstration-during-the-Bharat-Shakti-exercise-at-Pokhran-Rajasthan-300x200.jpg 300w" sizes="(max-width: 600px) 100vw, 600px" /><figcaption class="wp-element-caption">A-artillery-barrage-demonstration-during-the-Bharat-Shakti-exercise-at-Pokhran-Rajasthan</figcaption></figure>
</div>


<p class="wp-block-paragraph">Modernisation fundamentals are foundational to the GSPS 2032 and fleet management perspective which is holistic, realistic and time sensitive. It is also based on prioritised and tiered modernisation based on value, vulnerability, and risk analysis with judicious scaling to address critical operational imperatives. It also looks at a more holistic and contemporary model of &#8220;Lethality, Survivability, Agility, Sustainability, Connectivity, and Affordability&#8221; based on the commonality of base platform and technology convergence. The focus on indigenous solutions to Indian warfighting remains paramount.</p>



<p class="wp-block-paragraph">&nbsp;The spiral approach to technology induction emphasizes prioritizing functional capabilities, combat effectiveness, and closing capability gaps with existing technologies. Balancing expansion, modernization and sustenance involves harmonising fiscal requirements, standardising platforms, and evaluating the cost-benefit of sustaining legacy equipment to decrease sustainment costs.</p>



<p class="wp-block-paragraph">Planned upgrades and overhauls aim to extend tank life beyond 32 years, emphasising sub-system, system, and platform upgrades along with field fitment or medium repair or overall interventions. The emphasis is on a lead integrator and expanded facilities requiring careful planning of space, power, and weight (balance) management, during the design stage for ease of adaptability and timely cum short fitment cycle.</p>



<p class="wp-block-paragraph"><strong>AFV Fleet Management Perspective &#8211; SUDRO Model</strong></p>



<p class="wp-block-paragraph">The endeavour to keep the tank fleet in a 30:40:30 profile guides the &#8220;Fleet Management Perspective&#8221;. The framework accordingly focuses on a balanced approach of sustaining the present fleet, modernisation of legacy fleet to contemporary standards and induction of next-generation platform in a time sensitive domain. It also aims at balancing fleet expansion and fleet modernization within pragmatic resource availability.</p>



<p class="wp-block-paragraph">&nbsp;The pillars of this perspective thus must rest on five key aspects; sustain the current fleet and address voids; upgrade legacy fleet to bridge technological gaps till replacement platforms; develop and induct next-generation state-of-the-art replacement platforms; replace obsolete and beyond service life equipment progressively; and optimize indigenous capability for induction through IDDM category.</p>



<p class="wp-block-paragraph">Translating it entails life extension and periodic upgrades of T 72 to bring its technology capabilities as close to T90; T-90 medium repairs and modernisation upgrades to state-of-the-art technologies; and FRCV to replace beyond-life equipment which is negative to the cost-benefit of sustaining them.</p>



<p class="wp-block-paragraph"><strong>Future Ready Combat Vehicle (FRCV)</strong></p>



<p class="wp-block-paragraph">The FRCV program amplifies the Indian Army&#8217;s push for a modern battle tank with a robust and flexible base platform that can be adopted into a multitude of specialised armoured fighting vehicles. FRCV will offer multiple options for rapid operational employment enabling the Indian Army to execute operations across the entire continuum of conflict against diverse threats of the adversaries.</p>



<p class="wp-block-paragraph">The FRCV as the next generation main battle tank is to replace the vintage T-72 Tank Fleet (in service since 1979), which has progressively gone beyond its service life. While the initial fleet of T72 has been replaced by T90, the later production approx. 1770 tanks though upgraded, are not cost-effective to sustain and pose an operational risk due to obsolescence. Even if optimistically inducted in 2030, it will in all probability replace the balance T 72 fleet by around 2045. Thus, the time and operational expediency.</p>



<p class="wp-block-paragraph">The FRCV was planned to be developed under the Make Project since 2008-09, however, its turbulent journey swayed from a de-novo three-stage turnkey project outside the DPP in 2015, to MAKE 1 under the new DPP 2016 evolved to SP (Strategic Partnership) model in 2017. Accordingly, commencing 2015 multiple RFI&#8217;s were floated by Service Headquarters, the last one being in 2024. While the May 2021 RFI was issued and &#8216;In Principle Approval&#8217; given, the grant of AoN ( Acceptance of Necessity) by MoD is being expedited. The Indian Army is likely to issue a request for proposal (RFP) this year for a project of approximately Rs 57,000 crore to manufacture 1,770 future-ready combat vehicles (FRCVs) in India.</p>



<p class="wp-block-paragraph">READ MORE: <a href="https://imrmedia.in/future-ready-combat-vehicle/"><a href="https://imrmedia.in/avnl-proposes-infantry-combat-vehicle-for-indian-army/">AVNL proposes infantry combat vehicle for Indian Army</a></a></p>



<p class="wp-block-paragraph">DGMF have listed broad technical parameters under the project brief. The FRCVs, with a weight categorization of 55+/-10% with a high power-to-weight ratio of 27:1 HP/Ton, will have a crew of four. It will be equipped with cutting-edge technologies such as artificial intelligence (AI), drone integration, survivability suites including active protection systems, state of art fire control system, battlefield management systems, beyond line-of-sight strike capability, advanced communication, state of art optoelectronics, vetronics and enhanced situational awareness. Additionally, features like manned-unmanned teaming capability and seamless integration into network-centric warfare environments will enhance the overall operational effectiveness index of the Indian Army (IA) by catering for emerging threats in varied terrain.</p>



<p class="wp-block-paragraph">A main battle tank is a system of systems and is a fusion of apex technologies existing in the realm of land systems. Successful development under Make-I would result in acquisition, from a successful Development Agency (DA), through the &#8216;Buy (Indian-IDDM)&#8217; category with indigenous design and Development and a minimum of 50% IC. The Ministry of Defence, GoI, intends to procure quantity 590 FRCV in the first phase.</p>



<p class="wp-block-paragraph">The project for FRCV will provide a unique opportunity for the Indian Defence Industry to come together and help to build research and manufacturing capabilities to foster technological spinoffs benefitting a host of civil/dual-use applications.</p>



<p class="wp-block-paragraph"><strong>The Light Tank</strong></p>



<p class="wp-block-paragraph">Recognizing the strategic importance of high-altitude operations, the Indian Army is acquiring an indigenous light tank engineered for agile manoeuvrability and high lethality with other state-of-the-art technologies dovetailed. It aims to counterbalance the capabilities demonstrated by the Chinese Type 15 &#8216;Black Panther&#8217;, a third-generation tank currently operational along the LAC in the Northern borders where T72 or T90 may be terrain restricted.</p>



<p class="wp-block-paragraph">The broad employment concept of the light tank thus revolves around its superior mobility (strategic, operational, and tactical), versatility, enhanced manoeuvrability (small turning radius, high power-to-weight ratio, and low nominal ground pressure), and lethal firepower especially high angle fire cum missile firing ability supported by state of art electro-optronics, communication and multilayered survivability packaging. Its air portability and desired amphibious capability add to its operational matrix. Its availability would add teeth to limited offensive or quid pro quo operations into enemy territory. Thus, light tanks would add to the credible deterrence posture and warfighting capability in the Northern Front.</p>



<p class="wp-block-paragraph">READ MORE: <a href="https://imrmedia.in/future-ready-combat-vehicle/">Future Ready Combat Vehicle and Light Tanks</a></p>



<p class="wp-block-paragraph">Like FRCV light tanks too have had a turbulent history since the mid 1980&#8217;s of its approval. The Indian Light Tank (ILT) based on RFI of Apr 2021 has been accorded &#8216;Acceptance of Necessity (AoN)&#8217; in Sep 2022 to be progressed under two routes &#8211; one is the design and development route, in which the DRDO, alongside the industry partner, is working on 59 tanks, and there is another 295, which is under the &#8216;Make I&#8217; category which will be partially funded by the government as well as development partners. Named &#8216;Zorawar&#8217;, the tank has emerged from a collaborative effort between the Defence Research and Development Organisation (DRDO) and the private entity Larsen &amp; Toubro (L&amp;T). The development technical trials by the developer are underway and likely to be handed over for user trials end of 2024 or early 2025.</p>



<p class="wp-block-paragraph"><strong>Conclusion</strong></p>



<p class="wp-block-paragraph">The approach to future capability building must be inclusive and not exclusive, based on the larger intent of prevailing in today&#8217;s war and generating indigenous capabilities to fight and win future wars. FRCV and  Light Tank program are key strategic enablers, which will generate desired capabilities and bridge the future operational mismatch against escalating threats, particularly on the Northern borders.</p>
<p>The post <a href="https://imrmedia.in/army-modernisation-frcv-and-light-tanks-to-meet-future-war-requirements/">ARMY MODERNISATION-FRCV and Light Tanks to Meet Future War Requirements</a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://imrmedia.in/army-modernisation-frcv-and-light-tanks-to-meet-future-war-requirements/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Future Ready Combat Vehicle and Light Tanks</title>
		<link>https://imrmedia.in/future-ready-combat-vehicle/</link>
					<comments>https://imrmedia.in/future-ready-combat-vehicle/#respond</comments>
		
		<dc:creator><![CDATA[Lt Gen AB Shivane PVSM, AVSM]]></dc:creator>
		<pubDate>Fri, 08 Mar 2024 07:18:24 +0000</pubDate>
				<category><![CDATA[Army]]></category>
		<category><![CDATA[Defence Industry]]></category>
		<category><![CDATA[Emerging Technologies]]></category>
		<category><![CDATA[Modernisation]]></category>
		<category><![CDATA[FRCV]]></category>
		<category><![CDATA[Future Ready Combat Vehicles]]></category>
		<category><![CDATA[light tank]]></category>
		<category><![CDATA[SUDRO Model]]></category>
		<category><![CDATA[T72 tank]]></category>
		<category><![CDATA[T90 tank]]></category>
		<guid isPermaLink="false">https://imrmedia.in/?p=17119</guid>

					<description><![CDATA[<p>Paving the Course of Multi-spectrum Combat Overmatch  Introduction The ongoing trials of the light tank, system upgrade cum overhaul of T72 and the recent RFP to produce Future Ready Combat Vehicle (FRCV) have raised many eyebrows. Those professing the obituary of tanks and the exaggerated discourse on its suspect role in future battlespace lie disappointed [&#8230;]</p>
<p>The post <a href="https://imrmedia.in/future-ready-combat-vehicle/">Future Ready Combat Vehicle and Light Tanks</a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<h1 class="wp-block-heading">Paving the Course of Multi-spectrum Combat Overmatch </h1>



<h3 class="wp-block-heading" id="h-introduction"><strong>Introduction</strong></h3>



<p class="wp-block-paragraph">The ongoing trials of the light tank, system upgrade cum overhaul of T72 and the recent RFP to produce Future Ready Combat Vehicle (FRCV) have raised many eyebrows. Those professing the obituary of tanks and the exaggerated discourse on its suspect role in future battlespace lie disappointed and professionally misplaced.</p>



<p class="wp-block-paragraph">The utility of a tank lies in its deployability, employability and capability to be the decisive force. Its optimisation lies in its inclusive role as an agile, lethal, and survivable platform to lead the combined arms team and attain combat overmatch across all spectrums of conflict. Thus, the need to understand the role, desired capabilities, and fleet management perspective.</p>



<p class="wp-block-paragraph">The operational requirement is essentially based on medium-category tanks with light tanks supplementing its capabilities for marginal terrain like Northern borders. This remains the foundation of future operational and equipment construct.</p>



<h3 class="wp-block-heading"><strong>Modernisation Fundamentals and Upgradation Construct</strong></h3>



<p class="wp-block-paragraph">Modernisation fundamentals are foundational to the GSPS 2032 and fleet management perspective which is holistic, realistic and time sensitive. It is also based on prioritised and tiered modernisation based on value, vulnerability, and risk analysis with judicious scaling to address critical operational imperatives. It also looks at a more holistic and contemporary model of <em>“Lethality, Survivability, Agility, Sustainability, Connectivity, and Affordability”</em> based on the commonality of base platform and technology convergence. The focus on indigenous solutions to Indian warfighting remains paramount.</p>



<p class="wp-block-paragraph">&nbsp;The spiral approach to technology induction emphasizes prioritizing functional capabilities, combat effectiveness, and closing capability gaps with existing technologies. Balancing expansion, modernization and sustenance involves harmonising fiscal requirements, standardising platforms, and evaluating the cost-benefit of sustaining legacy equipment to decrease sustainment costs.</p>



<p class="wp-block-paragraph">Planned upgrades and overhauls aim to extend tank life beyond 32 years, emphasising sub-system, system, and platform upgrades along with field fitment or medium repair or overall interventions. The emphasis is on a lead integrator and expanded facilities requiring careful planning of space, power, and weight (balance) management, during the design stage for ease of adaptability and timely cum short fitment cycle.</p>



<figure class="wp-block-image size-full is-resized"><img decoding="async" width="600" height="400" src="https://imrmedia.in/wp-content/uploads/2024/03/The-initial-fleet-of-T72-tanks-has-been-replaced-by-T90S-tanks-1.jpg" alt="The initial fleet of T72 tanks has been replaced by T90S tanks" class="wp-image-17127" style="width:1068px;height:auto" srcset="https://imrmedia.in/wp-content/uploads/2024/03/The-initial-fleet-of-T72-tanks-has-been-replaced-by-T90S-tanks-1.jpg 600w, https://imrmedia.in/wp-content/uploads/2024/03/The-initial-fleet-of-T72-tanks-has-been-replaced-by-T90S-tanks-1-300x200.jpg 300w" sizes="(max-width: 600px) 100vw, 600px" /><figcaption class="wp-element-caption">The initial fleet of T72 tanks has been replaced by T90S tanks</figcaption></figure>



<h3 class="wp-block-heading"><strong>AFV Fleet Management Perspective &#8211; SUDRO Model</strong></h3>



<p class="wp-block-paragraph">The endeavour to keep the tank fleet in a 30:40:30 profile guides the “Fleet Management Perspective”. The framework accordingly focuses on a balanced approach of sustaining the present fleet, modernisation of legacy fleet to contemporary standards and induction of next-generation platform in a time sensitive domain. It also aims at balancing fleet expansion and fleet modernization within pragmatic resource availability.</p>



<p class="wp-block-paragraph">&nbsp;The pillars of this perspective thus must rest on five key aspects; <strong>sustain </strong>thecurrent fleet and address voids; <strong>upgrade</strong> legacy fleet to bridge technological gaps till replacement platforms; <strong>develop and induct</strong> next-generation state-of-the-art replacement platforms; <strong>replace</strong> obsolete and beyond service life equipment progressively; and <strong>optimize indigenous capability</strong> for induction through IDDM category.</p>



<p class="wp-block-paragraph">Translating it entails life extension and periodic upgrades of T 72 to bring its technology capabilities as close to T90; T-90 medium repairs and modernisation upgrades to state-of-the-art technologies; and FRCV to replace beyond-life equipment which is negative to the cost-benefit of sustaining them.</p>



<p class="wp-block-paragraph">ALSO READ: <a href="https://imrmedia.in/lts-light-tank-model-futuristic-systems-displayed/">L&amp;T’s Light Tank Model, Futuristic Systems Displayed</a></p>



<h3 class="wp-block-heading"><strong>Future Ready Combat Vehicle (FRCV)</strong></h3>



<p class="wp-block-paragraph">The FRCV program amplifies the Indian Army’s push for a modern battle tank with a robust and flexible base platform that can be adopted into a multitude of specialised armoured fighting vehicles. FRCV will offer multiple options for rapid operational employment enabling the Indian Army to execute operations across the entire continuum of conflict against diverse threats of the adversaries.</p>



<p class="wp-block-paragraph">The FRCV as the next generation main battle tank is to replace the vintage T-72 Tank Fleet (in service since 1979), which has progressively gone beyond its service life. While the initial fleet of T72 has been replaced by T90, the later production approx. 1770 tanks though upgraded, are not cost-effective to sustain and pose an operational risk due to obsolescence. Even if optimistically inducted in 2030, it will in all probability replace the balance T 72 fleet by around 2045. Thus, the time and operational expediency.</p>



<p class="wp-block-paragraph">The FRCV was planned to be developed under the Make Project since 2008-09, however, its turbulent journey swayed from a de-novo three-stage turnkey project outside the DPP in 2015, to MAKE 1 under the new DPP 2016 evolved to SP (Strategic Partnership) model in 2017. Accordingly, commencing 2015 multiple RFI’s were floated by Service Headquarters, the last one being in 2024. While the May 2021 RFI was issued and ‘In Principle Approval’ given, the grant of AoN ( Acceptance of Necessity) by MoD is being expedited. The Indian Army is likely to issue a request for proposal (RFP) this year for a project of approximately Rs 57,000 crore to manufacture 1,770 future-ready combat vehicles (FRCVs) in India.</p>



<p class="wp-block-paragraph">DGMF have listed broad technical parameters under the project brief. The FRCVs, with a weight categorization of 55+/-10% with a high power-to-weight ratio of 27:1 HP/Ton, will have a crew of four. It will be equipped with cutting-edge technologies such as artificial intelligence (AI), drone integration, survivability suites including active protection systems, state of art fire control system, battlefield management systems, beyond line-of-sight strike capability, advanced communication, state of art optoelectronics, vetronics and enhanced situational awareness. Additionally, features like manned-unmanned teaming capability and seamless integration into network-centric warfare environments will enhance the overall operational effectiveness index of the Indian Army (IA) by catering for emerging threats in varied terrain.</p>



<p class="wp-block-paragraph">A main battle tank is a system of systems and is a fusion of apex technologies existing in the realm of land systems. Successful development under Make-I would result in acquisition, from a successful Development Agency (DA), through the ‘Buy (Indian-IDDM)’ category with indigenous design and Development and a minimum of 50% IC. The Ministry of Defence, GoI, intends to procure quantity 590 FRCV in the first phase.</p>



<p class="wp-block-paragraph">The project for FRCV will provide a unique opportunity for the Indian Defence Industry to come together and help to build research and manufacturing capabilities to foster technological spinoffs benefitting a host of civil/dual-use applications.</p>



<figure class="wp-block-image size-full is-resized"><img decoding="async" width="600" height="338" src="https://imrmedia.in/wp-content/uploads/2024/03/Scale-model-of-a-light-tank-by-HVF-Avadi.jpg" alt="Scale model of a light tank by HVF Avadi" class="wp-image-17124" style="width:1068px;height:auto" srcset="https://imrmedia.in/wp-content/uploads/2024/03/Scale-model-of-a-light-tank-by-HVF-Avadi.jpg 600w, https://imrmedia.in/wp-content/uploads/2024/03/Scale-model-of-a-light-tank-by-HVF-Avadi-300x169.jpg 300w" sizes="(max-width: 600px) 100vw, 600px" /><figcaption class="wp-element-caption">Scale model of a light tank by HVF Avadi</figcaption></figure>



<h3 class="wp-block-heading"><strong>The Light Tank</strong></h3>



<p class="wp-block-paragraph">Recognizing the strategic importance of high-altitude operations, the Indian Army is acquiring an indigenous light tank engineered for agile manoeuvrability and high lethality with other state-of-the-art technologies dovetailed. It aims to counterbalance the capabilities demonstrated by the Chinese Type 15 &#8216;Black Panther&#8217;, a third-generation tank currently operational along the LAC in the Northern borders where T72 or T90 may be terrain restricted.</p>



<p class="wp-block-paragraph">The broad employment concept of the light tank thus revolves around its superior mobility (strategic, operational, and tactical), versatility, enhanced manoeuvrability (small turning radius, high power-to-weight ratio, and low nominal ground pressure), and lethal firepower especially high angle fire cum missile firing ability supported by state of art electro-optronics, communication and multilayered survivability packaging. Its air portability and desired amphibious capability add to its operational matrix. Its availability would add teeth to limited offensive or quid pro quo operations into enemy territory. Thus, light tanks would add to the credible deterrence posture and warfighting capability in the Northern Front.</p>



<p class="wp-block-paragraph">Like FRCV light tanks too have had a turbulent history since the mid 1980’s of its approval. The Indian Light Tank (ILT) based on RFI of Apr 2021 has been accorded ‘Acceptance of Necessity (AoN)’ in Sep 2022 to be progressed under two routes – one is the design and development route, in which the DRDO, alongside the industry partner, is working on 59 tanks, and there is another 295, which is under the ‘Make I’ category which will be partially funded by the government as well as development partners. Named &#8216;Zorawar&#8217;, the tank has emerged from a collaborative effort between the Defence Research and Development Organisation (DRDO) and the private entity Larsen &amp; Toubro (L&amp;T). The development technical trials by the developer are underway and likely to be handed over for user trials end of 2024 or early 2025.</p>



<p class="wp-block-paragraph">ALSO READ:<a href="https://imrmedia.in/army-hunts-for-light-tanks/">Army Hunts for Light Tanks</a></p>



<h3 class="wp-block-heading"><strong>Conclusion</strong> </h3>



<p class="wp-block-paragraph">The approach to future capability building must be inclusive and not exclusive, based on the larger intent of prevailing in today’s war and generating indigenous capabilities to fight and win future wars. FRCV and&nbsp; Light Tank program are key strategic enablers, which will generate desired capabilities and bridge the future operational mismatch against escalating threats, particularly on the Northern borders.</p>
<p>The post <a href="https://imrmedia.in/future-ready-combat-vehicle/">Future Ready Combat Vehicle and Light Tanks</a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://imrmedia.in/future-ready-combat-vehicle/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Army Hunts for Light Tanks</title>
		<link>https://imrmedia.in/army-hunts-for-light-tanks/</link>
					<comments>https://imrmedia.in/army-hunts-for-light-tanks/#respond</comments>
		
		<dc:creator><![CDATA[IMR Reporter]]></dc:creator>
		<pubDate>Fri, 15 Jul 2022 06:52:00 +0000</pubDate>
				<category><![CDATA[Army]]></category>
		<category><![CDATA[Modernisation]]></category>
		<category><![CDATA[CSK assault vehicle]]></category>
		<category><![CDATA[CVRDE]]></category>
		<category><![CDATA[DRDO]]></category>
		<category><![CDATA[FRCV]]></category>
		<category><![CDATA[Future Ready Combat Vehicles]]></category>
		<category><![CDATA[Light tanks]]></category>
		<category><![CDATA[Next Generation Main Battle Tank]]></category>
		<category><![CDATA[NGMBT]]></category>
		<category><![CDATA[Project Zorawar]]></category>
		<category><![CDATA[T-72 Ajeya tank]]></category>
		<category><![CDATA[T-90]]></category>
		<category><![CDATA[Type 15 light tank]]></category>
		<category><![CDATA[ZTL-11 wheeled armored personnel carrier]]></category>
		<category><![CDATA[ZTQ 15 tank]]></category>
		<guid isPermaLink="false">https://imrmedia.in/?p=14433</guid>

					<description><![CDATA[<p>The Indian Ministry of Defense (MoD) has approved the design and development of light battle tanks for the private sector to push the &#8216;Atmanirbhar Bharat&#8217; (self-reliant India) initiative. Under the Make-1 category, the industry will undertake the project and be funded by the government in a stark departure from the direct purchase route. The need [&#8230;]</p>
<p>The post <a href="https://imrmedia.in/army-hunts-for-light-tanks/">Army Hunts for Light Tanks</a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The Indian Ministry of Defense (MoD) has approved the design and development of light battle tanks for the private sector to push the &#8216;Atmanirbhar Bharat&#8217; (self-reliant India) initiative.</p>



<p class="wp-block-paragraph">Under the Make-1 category, the industry will undertake the project and be funded by the government in a stark departure from the direct purchase route.</p>



<p class="wp-block-paragraph">The need for a light tank was realized at the height of the standoff with the Chinese PLA in Ladakh that began in May 2020, where India had to move the heavier T-72 Ajeya tanks (45 tons) and the T-90 (46 tons).</p>



<p class="wp-block-paragraph">Although effective against all Chinese tanks and crewed by experienced and well-trained Indian Cavalry, they still caused movement and logistical issues in the high-altitude air and inhospitable terrain at 17,500 feet. The treacherous mountain passes made transport a bane, adding to the logistical strain of maintaining 50,000 troops.</p>



<p class="wp-block-paragraph">Things got worse in the winter of 2020 when the Indian Army had to sustain the high posture through the cold for the first time in 4 decades. Troops from both armies leave forward positions since the Line of Actual Control (LAC) is much calmer than the Line of Control (LoC) with Pakistan.</p>



<p class="wp-block-paragraph">Moreover, China&#8217;s logistical advantage owing to the extensive border infrastructure coming deep from within Tibet and Sichuan, allows it to replenish losses and keep units supported with spares. These operational difficulties associated with using heavy tanks in mountain warfare have pushed India&#8217;s light tank program.</p>



<p class="wp-block-paragraph">In the last two years, Beijing has positioned the most recent ZTL-11 wheeled armored personnel carriers, CSK series assault vehicles, and ZTQ 15 (Type 15) third-generation modern light tanks weighs roughly 33-36 tons along the LAC in Eastern Ladakh.</p>



<h3 class="wp-block-heading" id="h-drdo-l-t-partnership">DRDO-L&amp;T Partnership</h3>



<p class="wp-block-paragraph">DRDO &amp; Larsen and Toubro (L&amp;T) are working together fore the development of the light tank. The tank that is currently under fabrication, is based on the chassis of DRDO&#8217;s Next Generation Main Battle Tank (NGMBT) and the successful rollout of the first prototype could happen in 2023.</p>



<p class="wp-block-paragraph">This will also strengthen the DRDO&#8217;s proposal&nbsp; to develop the Next Generation Main Battle Tank (NGMBT) to meet the Indian Army&#8217;s requirement for 1,770 Next Generation Main Battle Tank (NGMBT) under Future Ready Combat Vehicles (FRCV) program.</p>



<h3 class="wp-block-heading">Project Zorawar</h3>



<p class="wp-block-paragraph">Talks have already started that the NGMBT will be manufactured through a Special Purpose Vehicle (SPV) under a public-private partnership (PPP) model which has been adopted for the development of the 5.5 generation AMCA and Indian Multi-Role Helicopter (IMRH).</p>



<p class="wp-block-paragraph">L&amp;T has revealed that it is a development partner in the &#8216;Zorawar Project&#8217; aimed at building light tanks for the Indian Army, with the first prototype expected to be unveiled in late 2023.</p>



<p class="wp-block-paragraph">While the company is involved in the platform&#8217;s development, L&amp;T is not assured a role in the tank&#8217;s production phase. Under the Indian process, development and manufacturing contracts could not be combined.</p>



<p class="wp-block-paragraph">The project is overseen by the Combat Vehicles Research and Development Establishment(CVRDE) of the DRDO.</p>



<p class="wp-block-paragraph">The Indian Army is looking for a light tank with a 25-ton weight limit and the same firepower as its traditional tanks. In addition, the military wants them to be equipped with loitering weapons, artificial intelligence (AI), tactical drone integration for surveillance to offer situational awareness, and an active defense system.</p>



<h3 class="wp-block-heading">Quest to Acquire Light Tank</h3>



<p class="wp-block-paragraph">The development of light tanks for the Indian Army was announced by the Modi government on March 3, 2022. This move was made under the Make-I category of the 2020 Defence Procurement Procedure (DPP).</p>



<p class="wp-block-paragraph">The Indian Army sensed a compelling need to put light tanks into service to counter China and establish operational superiority in high-altitude areas like Ladakh. After the border conflict with China in the summer of 2020, India initially considered purchasing the Russian light tank Sprut SDM1.</p>



<p class="wp-block-paragraph">A Request for Information (RFI) for 350 light tanks in the 25-ton weight category was released by the Directorate General of Mechanized Forces in April 2021 on behalf of the Ministry of Defence (MoD). However, the country has now decided to develop its own light tank rather than import them.</p>



<p class="wp-block-paragraph">The production and upkeep of India&#8217;s imported fleet of tanks had been impeded by the interruption in the world supply chain for defense-related components brought on by the ongoing Russia-Ukraine conflict. India must therefore create a light tank for the Indian Army domestically.</p>
<p>The post <a href="https://imrmedia.in/army-hunts-for-light-tanks/">Army Hunts for Light Tanks</a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://imrmedia.in/army-hunts-for-light-tanks/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Focus on Advanced Tech: DRDO Chief</title>
		<link>https://imrmedia.in/focus-on-advanced-tech-drdo-chief/</link>
					<comments>https://imrmedia.in/focus-on-advanced-tech-drdo-chief/#respond</comments>
		
		<dc:creator><![CDATA[IMR Reporter]]></dc:creator>
		<pubDate>Wed, 15 Jun 2022 06:42:00 +0000</pubDate>
				<category><![CDATA[DRDO]]></category>
		<category><![CDATA[Emerging Technologies]]></category>
		<category><![CDATA[Active Electronically Scanned Array]]></category>
		<category><![CDATA[Advanced materials]]></category>
		<category><![CDATA[Advanced Medium Combat Aircraft]]></category>
		<category><![CDATA[AESA Radar]]></category>
		<category><![CDATA[AIP]]></category>
		<category><![CDATA[Air Independent Propulsion System]]></category>
		<category><![CDATA[air-to-air missiles]]></category>
		<category><![CDATA[Airborne radars]]></category>
		<category><![CDATA[Airborne Warning and Control System]]></category>
		<category><![CDATA[Akash missiles]]></category>
		<category><![CDATA[AMCA]]></category>
		<category><![CDATA[Artificial Intelligence]]></category>
		<category><![CDATA[ATAGS]]></category>
		<category><![CDATA[AWACS]]></category>
		<category><![CDATA[cyber warfare]]></category>
		<category><![CDATA[Dr G Satheesh Reddy]]></category>
		<category><![CDATA[electro-magnetic technologies]]></category>
		<category><![CDATA[FICV]]></category>
		<category><![CDATA[FRCV]]></category>
		<category><![CDATA[Future Infantry Combat Vehicle]]></category>
		<category><![CDATA[Future Ready Combat Vehicle]]></category>
		<category><![CDATA[high-power lasers]]></category>
		<category><![CDATA[hypersonic weapons]]></category>
		<category><![CDATA[LCA Mark2]]></category>
		<category><![CDATA[Light Combat Aircraft]]></category>
		<category><![CDATA[long-range radars]]></category>
		<category><![CDATA[Quantum Communication]]></category>
		<category><![CDATA[surface-to-air missiles]]></category>
		<guid isPermaLink="false">https://imrmedia.in/?p=14153</guid>

					<description><![CDATA[<p>The DRDO is concentrating on advanced technologies like artificial intelligence, hypersonic weapons, cyber-warfare, electro-magnetic technologies, high-power lasers, long-range radars, quantum communication technologies, networking of systems and advanced materials, says DRDO chairman Dr G Satheesh Reddy. The industry has matured. It has moved from designing as per drawings to now having the ability to design according [&#8230;]</p>
<p>The post <a href="https://imrmedia.in/focus-on-advanced-tech-drdo-chief/">Focus on Advanced Tech: DRDO Chief</a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The DRDO is concentrating on advanced technologies like artificial intelligence, hypersonic weapons, cyber-warfare, electro-magnetic technologies, high-power lasers, long-range radars, quantum communication technologies, networking of systems and advanced materials, says DRDO chairman Dr G Satheesh Reddy.</p>



<p class="wp-block-paragraph">The industry has matured. It has moved from designing as per drawings to now having the ability to design according to the specifications. The encouragement to industry is showing. We have roped them in to make big equipment, on integration of missiles, bombs and many other systems.</p>



<p class="wp-block-paragraph">The immediate targets, according to Dr Reddy, are increasing the range of air-to-air missiles beyond 150 km and that of surface-to-air missiles beyond 250 km.</p>



<p class="wp-block-paragraph">Airborne radars and long-range 1,000-plus km radars are the next on plan, with the Active Electronically Scanned Array (AESA) radar for fighter jets ending its final testing. For the Advanced Medium Combat Aircraft (AMCA), DRDO “may go in for the special purpose vehicle model”.</p>



<p class="wp-block-paragraph">The Light Combat Aircraft (LCA) Mark2 is in the final design phase, while the AMCA design is in advanced stages. “We will definitely meet timelines on the AMCA and LCA Mark2,” he said.</p>



<p class="wp-block-paragraph">On ground fighting equipment, Dr Reddy said, “We are looking for partners for Future Infantry Combat Vehicle (FICV) and Future Ready Combat Vehicles (FRCV).”</p>



<p class="wp-block-paragraph">The scenario, he points out, is changing. “We are getting enquiries for export of Akash missiles, torpedoes and artillery gun, the ATAGS, to name a few.”</p>



<p class="wp-block-paragraph">Air Independent Propulsion System (AIP), that allows conventional submarines to remain under water for longer periods, has been demonstrated. “We are working to integrate the system. The basic model has been made.”</p>



<p class="wp-block-paragraph">India, he said, has become self-sufficient in many technological areas like missiles, radars, sonars, electronic warfare systems, Airborne Warning And Control System (AWACS), artillery guns, armoured vehicles and fighter aircraft.</p>



<p class="wp-block-paragraph">“Industry participation is growing. We have at least 2,000 industries, which are capable of making systems and sub-systems of equipment. Close to 10,000 are now suppliers of components,” according to Dr Reddy, who is also the secretary, Department of Defence R&amp;D.</p>



<p class="wp-block-paragraph">“Industry has matured. It has moved from the ability to design as per drawings to now have the ability to design as per specifications,” he says.</p>
<p>The post <a href="https://imrmedia.in/focus-on-advanced-tech-drdo-chief/">Focus on Advanced Tech: DRDO Chief</a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://imrmedia.in/focus-on-advanced-tech-drdo-chief/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>DRDO News</title>
		<link>https://imrmedia.in/drdo-news-5/</link>
					<comments>https://imrmedia.in/drdo-news-5/#respond</comments>
		
		<dc:creator><![CDATA[IMR Reporter]]></dc:creator>
		<pubDate>Wed, 20 Apr 2022 10:14:00 +0000</pubDate>
				<category><![CDATA[DRDO]]></category>
		<category><![CDATA[Emerging Technologies]]></category>
		<category><![CDATA[Air-launched BrahMos]]></category>
		<category><![CDATA[anti-tank guided missile]]></category>
		<category><![CDATA[brahmos]]></category>
		<category><![CDATA[defence research]]></category>
		<category><![CDATA[DRDO News]]></category>
		<category><![CDATA[Enhanced Pinaka Rocket System]]></category>
		<category><![CDATA[EPRS]]></category>
		<category><![CDATA[FRCV]]></category>
		<category><![CDATA[Helina]]></category>
		<category><![CDATA[light tank]]></category>
		<category><![CDATA[Long Range Pinaka]]></category>
		<category><![CDATA[Medium-Range Surface-to-Air Missile]]></category>
		<category><![CDATA[MRSAM]]></category>
		<category><![CDATA[NASM-SR]]></category>
		<category><![CDATA[Next Generation Main Battle Tank]]></category>
		<category><![CDATA[NGMBT]]></category>
		<category><![CDATA[SFDR]]></category>
		<category><![CDATA[Short Range Naval Anti-Ship Missile]]></category>
		<category><![CDATA[Solid Fuel Ducted Ramjet]]></category>
		<guid isPermaLink="false">https://imrmedia.in/?p=13543</guid>

					<description><![CDATA[<p>DRDO-L&#38;T Light Tank to rollout by 2023 A DRDO &#38; Larsen and Toubro light tank is currently under fabrication, based on the chassis of DRDO&#8217;s Next Generation Main Battle Tank (NGMBT) and the rollout of the first prototype is likely to happen in 2023. This will also strengthen the DRDO&#8217;s proposal&#160; to develop the Next [&#8230;]</p>
<p>The post <a href="https://imrmedia.in/drdo-news-5/">DRDO News</a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<h3 class="wp-block-heading" id="h-drdo-l-t-light-tank-to-rollout-by-2023">DRDO-L&amp;T Light Tank to rollout by 2023</h3>



<p class="wp-block-paragraph">A DRDO &amp; Larsen and Toubro light tank is currently under fabrication, based on the chassis of DRDO&#8217;s Next Generation Main Battle Tank (NGMBT) and the rollout of the first prototype is likely to happen in 2023.</p>



<p class="wp-block-paragraph">This will also strengthen the DRDO&#8217;s proposal&nbsp; to develop the Next Generation Main Battle Tank (NGMBT) to meet the Indian Army&#8217;s requirement for 1,770 Next Generation Main Battle Tank (NGMBT) under Future Ready Combat Vehicles (FRCV) program.</p>



<p class="wp-block-paragraph">Talks have already started that the Next Generation Main Battle Tank will be manufactured through a Special Purpose Vehicle (SPV) under a public Private partnership model which has been adopted for the development of the 5.5 generation AMCA and Indian Multi-Role Helicopter (IMRH).</p>



<h3 class="wp-block-heading">Solid Fuel Ducted Ramjet technology successfully tested</h3>



<p class="wp-block-paragraph">DRDO successfully flight tested Solid Fuel Ducted Ramjet (SFDR) booster at the Integrated Test Range (ITR), Chandipur off the coast of Odisha on 8 April 2022. The test successfully demonstrated the reliable functioning of all critical components involved in the complex missile system and met all the mission objectives.&nbsp;</p>



<p class="wp-block-paragraph">The SFDR-based propulsion enables the missile to intercept aerial threats at very long range at supersonic speeds. The performance of the system has been confirmed from the data captured by a number of range instruments like Telemetry, Radar and Electro Optical Tracking Systems deployed by ITR. The SFDR has been developed by Defence Research and Development Laboratory, Hyderabad in collaboration with other DRDO laboratories such as Research Centre Imarat, Hyderabad and High Energy Materials Research Laboratory, Pune.</p>



<h3 class="wp-block-heading">Short Range Naval Anti-Ship Missile (NASM-SR) Ready</h3>



<p class="wp-block-paragraph">DRDO was in the process of developing a Naval Antishipping Missile Short Range (NASM-SR) with an estimated range of 55 km for use from Sea King helicopters and eventually equip the MH-60R helicopters. This project is possibly being developed for a number of platforms, having different ranges. ‘SR’, or Short Range, means that development of other longer range versions is expected as well.</p>



<p class="wp-block-paragraph">According to DRDO, the NASM-SR will be a 380 kg projectile with a maximum range of 55 km and used initially with Indian Navy Sea King helicopters, replacing the earlier Sea Eagle missiles. As the Sea King itself is approaching the end of its service life, it may be expected that the new indigenous missile will be in service with future helicopters of the Navy.</p>



<p class="wp-block-paragraph">The American made MH-60R helicopters is due to arrive in July 2022 which is a multi-role platform and these are slated to be equipped with Kongsberg Naval Strike Missile. Further, for the Indian Navy’s IMRH acquisition, MBDA pitched its Sea Venom which has a range of 25 km and also the Marte-ER which can reach more than 100 km.</p>



<p class="wp-block-paragraph">The NASM-SR could be considered for these potent platforms. The long range version of the NASM may have a range excess of 150 km, enabling engagement of hostile targets from stand-off distances.</p>



<p class="wp-block-paragraph">The Indian Navy is also in the market for new medium range anti-ship missiles (MRAShM) for 24 current and future warships as detailed by Livefist — three Delhi-class destroyers, four Kora-class missile corvettes and the six new Next Generation Missile Vessels (NGMV) that will enter service in the next decade. The other anti-ship missiles currently in service with the Indian Navy are Boeing Harpoon Block-IIIs on the P-8I Poseidon fleet.</p>



<h3 class="wp-block-heading">Long Range Pinaka missile system Tested</h3>



<p class="wp-block-paragraph">A new version of the Pinaka rocket system has been successfully flight-tested by the DRDO and the Indian Army at the Pokhran firing ranges, the defence ministry said on 9 April. As many as 24 Pinaka Mk-I Enhanced Rocket Systems were fired for different ranges during the last fortnight and the weapons met the required accuracy and consistency, it said.</p>



<p class="wp-block-paragraph">The EPRS is the upgraded version of the Pinaka variant that has been in service with the Indian Army for the last decade. The ministry said the rocket system has been upgraded with advanced technologies enhancing the range to meet the emerging requirements.</p>



<p class="wp-block-paragraph">With these trials, the initial phase of technology absorption of EPRS by the industry has successfully been completed and the industry partners are ready for user trials/series production of the rocket system.</p>



<p class="wp-block-paragraph">The Pinaka rocket system has been developed by Armament Research and Development Establishment, Pune, supported by High Energy Materials Research Laboratory, another Pune-based laboratory of the DRDO.</p>



<p class="wp-block-paragraph">After establishing the performance efficacy of the enhanced range version of Pinaka, the technology was transferred to Munitions India Limited MIL and Economic Explosives Limited, Nagpur.</p>



<h3 class="wp-block-heading">Anti-Tank Guided Missile ‘HELINA’ successfully flight tested</h3>



<p class="wp-block-paragraph">Indigenously developed helicopter launched Anti-Tank Guided Missile ‘HELINA’ was successfully flight tested on April 11, 2022 at high-altitude ranges as part of user validation trials. The flight-test was jointly conducted by the teams of scientists from Defence Research and Development Organisation (DRDO), Indian Army and Indian Air Force (IAF).</p>


<div class="wp-block-image">
<figure class="aligncenter size-full"><img loading="lazy" decoding="async" width="600" height="362" src="https://imrmedia.in/wp-content/uploads/2022/07/Anti-Tank-Guided-Missile-‘Helina-being-test-fired-from-a-Advanced-Light-Helicopter.jpg" alt="Anti-Tank Guided Missile ‘Helina’ being test-fired from a Advanced Light Helicopter" class="wp-image-13545" srcset="https://imrmedia.in/wp-content/uploads/2022/07/Anti-Tank-Guided-Missile-‘Helina-being-test-fired-from-a-Advanced-Light-Helicopter.jpg 600w, https://imrmedia.in/wp-content/uploads/2022/07/Anti-Tank-Guided-Missile-‘Helina-being-test-fired-from-a-Advanced-Light-Helicopter-300x181.jpg 300w" sizes="auto, (max-width: 600px) 100vw, 600px" /><figcaption>Anti-Tank Guided Missile ‘Helina’ being test-fired from a Advanced Light Helicopter</figcaption></figure>
</div>


<p class="wp-block-paragraph">The anti-tank missile was tested again next day, this time in the northern high altitude mountain regions after its successful test on Monday in the desert regions of Pokhran.</p>



<p class="wp-block-paragraph">The flight trials were conducted from an Advanced Light Helicopter (ALH) and the missile was fired successfully engaging simulated tank target. The missile is guided by an Imaging Infra-Red (IIR) Seeker operating in the Lock on Before Launch mode.</p>



<p class="wp-block-paragraph">It is one of the most advanced anti-tank weapons in the world. In continuation to validation trials conducted at Pokhran in Rajasthan, proof of efficacy at high altitudes paves the way for its integration on the ALH. The trials were witnessed by senior Army commanders and senior scientists of the DRDO.</p>



<p class="wp-block-paragraph">With the flight test, consistent performance of the complete system, including Imaging Infra-Red Seeker, has been established, which will enable the induction of the ‘Helina’ into the armed forces,” said a press statement from the Ministry of Defence on 12 April.</p>



<p class="wp-block-paragraph">DRDO has said that the Helina missile system has all weather day and night capability and can defeat battle tanks with conventional armour as well as explosive reactive armour. It has been developed for integration with choppers in both the Army and Air Force.</p>



<h3 class="wp-block-heading">Indo-Israeli Medium-Range Surface-to-Air Missile Tested Twice</h3>



<p class="wp-block-paragraph">India successfully conducted twin tests of Medium-Range Surface-to-Air Missile (MRSAM) from a defence facility off Odisha coast on 27 March 2022 demonstrating the system’s high killing efficiency against high-speed aerial targets.</p>



<p class="wp-block-paragraph">The network-centric and most advanced sleek missile has been developed by DRDO and Israel Aerospace Industries (IAI) in collaboration with public and private sector enterprises.</p>



<p class="wp-block-paragraph">The MRSAM-Army system intercepted unmanned aerial vehicles and destroyed them completely achieving direct hits at both long and short ranges. The missile intercepted the target in medium altitude at long range during the first trial and destroyed another target in low altitude at short range during second trial.</p>



<p class="wp-block-paragraph">With a strike range of nearly 100 km, the 4.5-meter long supersonic quick reaction missile weighs around 2.7 tonne and can carry a payload of 60 kg. Travelling at a speed of Mach 2, it can achieve high degrees of manoeuvrability at the terminal phase.</p>



<p class="wp-block-paragraph">Each MRSAM unit comprises one command and control system, multi functional surveillance tracking radar, threat alert radar, mobile launcher, combat management system, mobile power and radar power systems apart from the missile.</p>



<p class="wp-block-paragraph">The next generation weapon system has been developed with cutting-edge technology to neutralise airborne threats like jets, subsonic and supersonic cruise missiles, anti tank systems and rockets.</p>



<p class="wp-block-paragraph">One of the variants of MRSAM system has already been handed over to Indian Air Force (IAF). The missile is designed to provide point and area air defence for ground assets against a wide range of threats.</p>



<h3 class="wp-block-heading">Air-launched BrahMos hits targets 800 km away</h3>



<p class="wp-block-paragraph">India is developing a new air-launched version of the BrahMos supersonic cruise missile which would be able to strike at enemy targets at more than 800 kilometres.</p>



<p class="wp-block-paragraph">India has enhanced the range of the tactical missile recently, and it can go beyond 500 kilometres with just an upgrade in its software.</p>



<p class="wp-block-paragraph">The Indian Air Force has equipped around 40 of its Su-30 combat aircraft with the BrahMos cruise missiles, which can cause heavy destruction in enemy camps.</p>



<p class="wp-block-paragraph">BrahMos was also successfully test-fired in the Andaman and Nicobar, on 23 March.</p>



<p class="wp-block-paragraph">Earlier in March, the Indian Navy had successfully demonstrated the accuracy of an extended-range land-attack Brahmos supersonic cruise missile from the stealth destroyer INS Chennai.</p>
<p>The post <a href="https://imrmedia.in/drdo-news-5/">DRDO News</a> appeared first on <a href="https://imrmedia.in">IMR</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://imrmedia.in/drdo-news-5/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
